How Expansion Plans Can Influence Wastewater and Stormwater Pumping Systems

It could make engineering simpler if all the water flowed at the same rate.

It’s not.

The amount of waste that enters a residential water system may fluctuate throughout the day. Industrial and commercial buildings can have operating highs. Stormwater flow is affected by weather conditions. The demand for clean water can also increase and decreases based on the use.

It’s not enough to choose equipment that is able to meet a certain flow rate when designing the pumping station. Engineers should be aware of possible conditions in which the equipment will be used.

Image credit: romtecutilities.com

Think in Operating Conditions Think in Operating Conditions, Not just Maximum Capacity

It is clear that the maximum flow is a crucial factor but it’s only a part of the operation of an infrastructure. If a system for wastewater is designed to accommodate a high maximum flow. The majority of the time the flow inflow could be significantly less. The station still needs to operate appropriately during those ordinary times.

This raises questions such as wet-well sizing and the size of the pump, control the head’s condition, the best way to modify equipment when demand shifts.

A well-designed package pumping system brings these elements to meet the needs of the site instead of considering the maximum capacity of the pump as the main design objective.

Everyday, the Wastewater System has its own rhythm

A wastewater lift station serving homes, businesses, or municipal infrastructure may experience changing influent conditions throughout its operating cycle.

The station’s management strategy determines how the system takes in wastewater and runs its pumps. Dimensions of the structure, pumping equipment, valves piping, electrical components, and even controls all play an important role in that process.

Other considerations specific to the location could enter the design. Romtec Utilities can incorporate auxiliary equipment like grinder vaults and odor control equipment in the event that they are required by the particular application. This creates a station which is specifically designed to suit the project, rather than being a generic design applied to all wastewater sites.

Stormwater can change much faster

Stormwater offers a different operational set of conditions. During dry weather an apex stormwater lift station might not be used much. But during the most severe storms, the station could see a significant increase in activity. The station can be an element of a larger flood-control, detention, treatment, or drainage strategy, making the surrounding stormwater plan an essential element of the system design.

Romtec Utilities takes into consideration things like the flow rate required along with head-related conditions, the size of the system, requirements of site, and environmental concerns when designing these systems.

Stations for commercial development may appear different than the ones designed for municipal stormwater use.

Both head conditions and flow are crucial.

Engineers need to be aware of where the water is going and what obstacles they have to overcome. Engineers also need to know where the water is headed and the resistance that the pumping system is expected to face.

Pumps can be operated with different head sizes based on the configuration of the system, like the piping, discharge conditions, etc.

The connection between head and flow is one reason simply choosing an appropriate pump based upon a capacity rating isn’t enough. Technology and station layout should be able to meet the requirements of hydraulics of the particular application.

Plan for the conditions that the station will experience

Romtec Utilities creates customized pumping system for wastewater, stormwater and clean water systems. They also design systems for boosters, industrial and other purposes. The process can include budgeting and preliminary design, complete plans, system supplies, documentation and start-up, testing and commissioning.

The fundamental concept of engineering is that a genuine pumping systems aren’t operating in a set of conditions.

They face changes in flows, demands, and project-specific hydraulic demands. A successful station has to be designed to meet the demands of the future.